After installation, gas fire system must pass strict acceptance before use. This article introduces the acceptance process and key points.

1. Documents to Prepare

- As-built drawings: system layout, piping, electrical diagrams
- Product documents: certificates, test reports, CCC certificates
- Construction records: pressure test, purging, hidden works records

2. Site Acceptance Contents

- Visual inspection: check cylinders, pipelines, nozzles, alarms installation
- Function test: detectors, sounder, discharge indicator, manual buttons
- Linkage test: simulate fire signal, check controller logic and equipment linkage
- Simulation discharge test: most important test, use nitrogen instead of agent